Finally started getting things put back together. Feels good to be torquing some of these bolts for the last time! The crank was polished and balanced with the flywheel. I also had the friction surface of the flywheel ground.
Just waiting on some tools and materials to show up so I can reassemble the head.
 |
New STD bearings and polished journals |
 |
Crank installed |
 |
+.040" Mahle Pistons |
 |
Balanced and resurfaced flywheel; refinished starter |
No comments:
Post a Comment